icon-arrow icon-facebook icon-linkedin icon-mail icon-mail-company icon-phone icon-twitter icon-whatsapp icon-share icon-link icon-download icon-youtube icon-flickr icon-search icon-close icon-filter icon-round-close icon-vcard paper-plane icon-footprint icon-faq icon-maps Vimeo
Poland

Commissioning LNG terminal.

The objective of this project was to demonstrate and record the newly constructed part of the LNG terminal to ensure that all separate systems perform in accordance with specified requirements, and to guarantee a safe and successful start-up afterwards.

Location
Świnoujście
Country
Poland

A safe and successful start-up is what commissioning is all about, we started with the end in mind.

Testing the high and low pressure parts of the full installation after we cleared the plant of water with our nitrogen pumps.

Afterwards we dried the system to several dewpoint, criteria for gas and liquid loaded systems were different and we adhered to the clients requirements.

Well executed tests and all dewpoints achieved the system was ready to see LNG for the first time. 

That's the goal we had in mind at the start and we delivered a successful job once again.

Gassing in LNG ships or inerting these ships with nitrogen is a services we already provide, with this combination we are the company to contact for LNG related services.

Want to know more about our LNG related services? Please do not hesitate to contact our sales department via +31 (0)524 599 980 of sales@prs-international.nl

Related Commissioning